Johnson v. Crew Builders CA4/1

California Court of Appeal · D083549 · 2025-06-18 · Unpublished

Proceeding
appeal from a judgment
Trial court
Superior Court of San Diego County · No. 37-2021-00033025-CU-PO-CTL
Trial judge
Marcella O. McLaughlin
Outcome
affirmed — Affirmed.
Area
civil
Panel
Julia C. Kelety (author), O'Rourke, Michele M. Castillo

Analysis

A model's reading — qwen3.8-27b, prompt v1, 2026-10-13T03:46Z · confidence high

The trial court granted summary judgment in favor of Crew Builders, ruling that the Privette doctrine barred Johnson's negligence claims because Crew did not retain control over the contracted work or conceal a hazardous condition. The Court of Appeal affirmed the judgment, holding that Crew was not differently situated from the defendants in the related *CBRE* case and that Johnson failed to raise triable issues of fact regarding the retained control or concealed condition exceptions.

Ruling reviewedStandardThe courtThe model
Granting of summary judgment in favor of Crew Builders based on the Privette doctrine.
“The trial court granted Crew’s motion for summary judgment based on its conclusion that the Privette doctrine barred Johnson’s claims against Crew.”
de novocorrectagree with court
The appellate court applied de novo review, consistent with the standard for summary judgment motions. It relied on the precedent set in *CBRE v. Superior Court* (102 Cal.App.5th 639), finding that Crew’s role was materially identical to that of PRI and CBRE. The court determined that Crew did not retain control over the permitting process (which was not part of the contracted work) nor did it conceal a hazard that PCF could not have reasonably discovered, thus affirming the trial court's ruling.

Authorities

  • relied: Privette v. Superior Court (1993) 5 Cal.4th 689 — Establishes the general rule that a hiring entity is not liable for injuries sustained by employees of independent contractors, subject to specific exceptions.
  • relied: Sandoval v. Qualcomm Incorporated (2021) 12 Cal.5th 256 — Clarifies the Privette doctrine's presumption that hirers delegate all control and tort duties to independent contractors, and defines the 'retained control' and 'concealed hazard' exceptions.
  • relied: CBRE v. Superior Court (2024) 102 Cal.App.5th 639 — Held that the Privette doctrine shielded PRI and CBRE from liability in the same incident, finding no triable issue of fact regarding retained control over permitting or concealed hazards.
  • relied: Hooker v. Department of Transportation (2002) 27 Cal.4th 198 — Defines the 'retained control' exception to the Privette doctrine, requiring that the hirer exercise retained control in a manner that affirmatively contributes to the injury.
  • relied: Kinsman v. Unocal Corp. (2005) 37 Cal.4th 659 — Establishes that the 'concealed condition' exception applies only if the contractor did not know and could not have reasonably discovered the hazardous condition.
  • relied: Aguilar v. Atlantic Richfield Co. (2001) 25 Cal.4th 826 — Outlines the burden-shifting framework for summary judgment motions under Code of Civil Procedure section 437c.
  • relied: Tverberg v. Fillner Construction, Inc. (2012) 202 Cal.App.4th 1439 — Cited by analogy to distinguish situations where a general contractor's inaction or specific control over safety protocols might constitute retained control, contrasting with the present case where the contractor had freedom to accommodate hazards.

The appellate opinion: sound — The opinion is sound because it correctly applies the de novo standard of review for summary judgment and relies on the binding precedent of *CBRE v. Superior Court* to resolve the identical factual and legal issues. The court logically extends the *CBRE* holding to Crew Builders, noting that Crew's willingness to proceed without permits is not materially different from the owner's direction, and that the electrical subcontractor had the ability to discover the hazards or decline the work.

How this analysis was made · dispute it

unusual disposition

A model's reading — claude-fable-5-1, prompt v1, 2026-10-13T04:29Z · confidence medium

The San Diego Superior Court granted summary judgment to general contractor Crew Builders on electrician Jake Johnson's negligence and related claims, holding the Privette doctrine barred them and that neither the concealed-hazard nor the retained-control exception raised a triable issue. The Court of Appeal affirmed de novo, holding that its prior published decision in CBRE v. Superior Court shielding the owner and property manager applied equally to Crew because Crew was not materially differently situated, and that Crew's alleged role in re-energizing the 277-volt lighting circuit did not create a triable issue of retained control.

Ruling reviewedStandardThe courtThe model
Grant of summary judgment to Crew Builders on all causes of action based on the Privette doctrine
“Because we conclude Crew is not differently situated in any material way, we likewise affirm the judgment as to Crew.”
de novocorrectagree with court
Under Privette and Sandoval a hirer presumptively delegates all safety responsibility to the independent contractor; Crew was a hirer in the chain above PCF, and the court's published CBRE decision on the same facts governs unless Crew's position differs materially. The opinion identifies no material difference, and the burden-shifting analysis under Code Civ. Proc. § 437c and Aguilar is correctly stated.
Concealed hazardous condition exception (Kinsman) does not apply because PCF and Johnson could reasonably have discovered the lack of permits and the 277-volt wire
“Neither PCF nor Johnson was any less able to discover the lack of permits or the 277-volt wire based on Crew’s conduct as opposed to PRI and CBRE’s. Johnson presents no new evidence to the contrary.”
de novocorrectagree with court
Kinsman limits the exception to hazards the contractor did not know of and could not reasonably have discovered; PCF, an electrical subcontractor, knew the project was unpermitted and Johnson knew the 277-volt circuit was energized. The trial court's finding quoted in CBRE was actually made on Crew's motion, so the analysis transfers directly.
Retained control exception (Hooker) does not apply based on Crew's proceeding without legally required permits
“We see no means by which to distinguish Crew’s willingness to proceed without permits from PRI and CBRE’s direction that Crew do so, at least not within the context of a Privette analysis.”
de novocorrectagree with court
CBRE held permits were not part of the contracted work and that the owner's decision did not affirmatively contribute to the injury or prevent PCF from taking independent precautions; Crew, which merely followed that direction, stands in no stronger position for liability. The court relies on CBRE's municipal-code reasoning on the 'legally required' argument but does not cite SeaBright, which holds that statutory safety obligations are delegated under Privette; that omission does not change the result.
Retained control exception does not apply based on Crew's alleged premature re-energizing of the 277-volt lighting circuit to relocate temporary lighting
“Accordingly, the additional factor of Crew’s involvement in re-energizing the suite does not compel a different result in this case.”
de novocorrectagree with court
Sandoval holds that a hirer's control over power-down does not amount to retained control over the contracted work where the contractor had freedom to accommodate live circuits; Johnson knew the circuit was on, PCF was responsible for safe-off, and no evidence showed Crew required him to work in the energized junction box. The court concedes 'some question' about Crew's role in the power schedule, but under Sandoval that factual dispute is not material absent evidence Crew's exercise of control affirmatively contributed to the injury.

Authorities

  • relied: CBRE v. Superior Court (2024) 102 Cal.App.5th 639 — On the same incident, the Privette doctrine shielded the owner and property manager as a matter of law; the concealed-hazard and retained-control exceptions did not apply because permits were not part of the contracted work and PCF could have discovered the hazards and taken independent precautions.
  • relied: Privette v. Superior Court (1993) 5 Cal.4th 689 — A hirer of an independent contractor generally is not liable for injuries to the contractor's employees caused by the contractor's negligence in performing the work.
  • relied: Sandoval v. Qualcomm Incorporated (2021) 12 Cal.5th 256 — Hirer presumptively delegates all control over contracted work and concomitant tort duties; a hirer's control over the power-down process is not retained control where the contractor had freedom to accommodate live circuits in its own manner.
  • relied: Hooker v. Department of Transportation (2002) 27 Cal.4th 198 — A hirer is liable under the retained control exception only where it exercised retained control in a manner that affirmatively contributed to the employee's injury.
  • relied: Kinsman v. Unocal Corp. (2005) 37 Cal.4th 659 — A hirer may be liable for a concealed hazard only if the contractor did not know and could not reasonably have discovered the hazardous condition.
  • relied: Aguilar v. Atlantic Richfield Co. (2001) 25 Cal.4th 826 — Summary judgment burden-shifting framework: the moving defendant must show a cause of action cannot be established or a complete defense exists, after which the plaintiff must show a triable issue of material fact.
  • relied: Tverberg v. Fillner Construction, Inc. (2012) 202 Cal.App.4th 1439 — Distinguished: retained control liability may arise where a general contractor ignores a request to address an unsafe condition; no such evidence existed here.
  • missed: SeaBright Ins. Co. v. US Airways, Inc. (2011) 52 Cal.4th 590 — Under Privette, a hirer impliedly delegates to the independent contractor its duties to comply with statutory and regulatory workplace safety requirements, which would directly answer Johnson's argument that Crew's failure to obtain legally required permits was presumptively negligent and nondelegable.

The appellate opinion: sound with gaps — The opinion correctly applies Privette, Sandoval, Hooker and Kinsman, and its reliance on the published CBRE decision arising from the same incident is sound because Crew's position is indistinguishable in any material way. It leaves gaps by not addressing SeaBright on Johnson's 'legally required permits' argument and by acknowledging an unresolved factual question about Crew's role in the power schedule without squarely explaining why that dispute is immaterial under the affirmative-contribution requirement.

How this analysis was made · dispute it

Opinion

Filed 6/18/25 Johnson v. Crew Builders CA4/1 NOT TO BE PUBLISHED IN OFFICIAL REPORTS California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication or ordered published for purposes of rule 8.1115.

COURT OF APPEAL, FOURTH APPELLATE DISTRICT

DIVISION ONE

STATE OF CALIFORNIA

JAKE JOHNSON, D083549

Plaintiff and Appellant, v. (Super. Ct. No. 37-2021- 00033025-CU-PO-CTL) CREW BUILDERS, Defendant and Respondent.

APPEAL from a judgment of the Superior Court of San Diego County, Marcella O. McLaughlin, Judge. Affirmed. Hoffman & Forde, Michael Dicks; Berding & Weil, Anne L. Rauch and Trinette S. Sachrison, for Plaintiff and Appellant. Devaney Pate Morris & Cameron, William C. Pate and Lesley A. Ionescu, for Defendant and Respondent. Jake Johnson appeals from an order granting summary judgment entered in favor of Crew Builders (Crew) based on the Privette doctrine. (See Privette v. Superior Court (1993) 5 Cal.4th 689 (Privette) [limiting liability of hiring entities for injuries sustained by employees of independent contractors].) Johnson was severely injured while working on a construction project, which involved improvements to a building owned by Property 1 Reserve, Inc. (PRI) and managed by CBRE. Crew was the general contractor, hired by PRI and CBRE; PCF Electric (PCF) was an electrical subcontractor, hired by CBRE; and Johnson was an electrician, hired by PCF. In a related case, this court granted a petition for writ of mandate directing the court to grant summary judgment to PRI and CBRE based on the Privette doctrine. (See CBRE v. Superior Court (2024) 102 Cal.App.5th 639 (CBRE).) Because we conclude Crew is not differently situated in any material way, we likewise affirm the judgment as to Crew. I. FACTUAL AND PROCEDURAL BACKGROUND The facts surrounding the incident that led to Johnson’s injury are set forth in our previous opinion in CBRE. (See CBRE, supra, 102 Cal.App.5th at pp. 642−645.) We summarize them only briefly here. Johnson was electrocuted while working as an electrician on a commercial suite remodel project, managed by Crew. Crew believed permits were required for the project, but the building owner, PRI, instructed Crew not to obtain them. (Id. at pp. 643−644.) In soliciting bids from subcontractors, Crew indicated the project would not be permitted. (Id. at p. 644.) The permitting process would have required updated electrical circuit maps and line drawings. Johnson contends those drawings would have indicated the presence of a 277-volt wire involved in his injury. On the day of the incident, Johnson was working on an outlet box attached to a 120-volt electrical circuit. (CBRE, supra, 102 Cal.App.5th at p. 644.) The 120-volt circuit was powered down, but a separate 277-volt circuit had been turned on the day before, after Johnson finished working on the lighting powered by the 277-volt circuit. (Ibid.) While working on the 120-volt outlet, Johnson saw a junction box cover labeled “120-volt” on the floor and an open junction box in the ceiling above, 2 so he went to replace the cover. (CBRE, supra, 102 Cal.App.5th at p. 644.) He knew the 277-volt power circuit was on, because the overhead lighting had been turned on and temporary lighting had been removed the day before, but he did not know that the junction box contained wiring for both the 277- volt and 120-volt circuits. (Ibid.) While replacing the cover, Johnson touched a live 277-volt wire. (Ibid.) He was electrocuted and fell off the ladder, causing significant injuries. (Ibid.) Jake filed a complaint against PRI, CBRE, Crew and PCF. In the operative first amended complaint, he asserted causes of action for negligence, negligent employment/supervision, negligent infliction of emotional distress, failure to maintain a safe work environment, failure to follow OSHA regulations, failure to abide by city building codes, failure to provide safe and non-hazardous conditions, and failure to follow the doctrine of premises liability against all named defendants. The defendants each filed motions for summary judgment based on the Privette doctrine. The trial court initially denied PRI and CBRE’s motion based on a finding that there was a triable issue of fact as to whether PRI and CBRE hired Crew as the general contractor before or after Johnson’s injury. The same issue did not impact Crew, and the trial court granted Crew’s motion for summary judgment based on its conclusion that the Privette doctrine barred Johnson’s claims against Crew. PRI and CBRE field a petition for writ of mandate, asking this court to address the denial of their summary judgment motions before trial. (See CBRE, supra, 102 Cal.App.5th 639.) This court concluded there was no triable issue of fact as to whether PRI and CBRE had hired Crew in a manner sufficient to invoke the Privette doctrine prior to Johnson’s injury, and, in a divided decision, that the Privette doctrine shielded PRI and CBRE 3 from liability as a matter of law. (CBRE, at pp. 650−658; see also id. at pp. 659−664 (dis. opn. of Kelety, J.) [a jury should decide whether PRI and CBRE retained control over the permitting process].) Accordingly, this court issued a writ of mandate directing the trial court to vacate its order denying PRI’s and CBRE’s motion for summary judgment and enter a new order granting the motion. (Id. at p. 659 (maj. opn.).) Meanwhile, Johnson filed a timely notice of appeal of the related judgment entered in favor of Crew. II. DISCUSSION Johnson asserts, as he did in CBRE, that two common exceptions to the Privette doctrine—retained control and a concealed hazardous condition— apply here and preclude application of the doctrine to Crew. He contends Crew retained control of the permitting process, and if it had proceeded with permitting as required, the process would have revealed that there was a 277-volt wire in the junction box that ultimately led to his injury. In addition, he contends Crew prematurely energized the overhead lighting in the suite so it could move the previously provided temporary lighting to another project, without following the proper protocols and without providing Johnson with appropriate safety gear. As we explained in CBRE: “In Privette, the California Supreme Court recognized the common law principle that ‘a person who hired an independent contractor generally was not liable to third parties for injuries caused by the contractor’s negligence in performing the work.’ (Privette, supra, 5 Cal.4th at p. 693.) The doctrine presumes that the hirer of an independent contractor ‘ordinarily delegates to that independent contractor all responsibility for the safety of the contractor’s workers.’ (Sandoval v. Qualcomm Incorporated (2021) 12 Cal.5th 256, 264 (Sandoval).) This 4 presumption ‘is grounded in two major principles: first, that independent contractors by definition ordinarily control the manner of their own work; and second, that hirers typically hire independent contractors precisely for their greater ability to perform the contracted work safely and successfully.’ (Id. at p. 269.) Thus, we generally presume ‘that a hirer delegates all control over the contracted work, and with it all concomitant tort duties, by entrusting work to a contractor.’ (Id. at p. 270.)” (CBRE, supra, 102 Cal.App.5th at p. 646.) “However, ‘that presumption gives way to two recognized exceptions: where the hirer . . . withholds critical information regarding a concealed hazard . . . or retains control over the contractor’s work and actually exercises that control in a way that affirmatively contributes to the worker’s injury.’ (Sandoval, supra, 12 Cal.5th at p. 264.)” (CBRE, supra, 102 Cal.App.5th at p. 646.) “A trial court shall grant a motion for summary judgment ‘if all the papers submitted show that there is no triable issue as to any material fact and that the moving party is entitled to a judgment as a matter of law.’ (Code Civ. Proc., § 437c, subd. (c).)” (CBRE, supra, 102 Cal.App.5th at p. 646.) “As the moving party, [Crew] had the initial burden of establishing that Johnson . . . either could not prove or that there was a complete defense to each cause of action as alleged in the complaint. (§ 437c(p)(2); Aguilar v. Atlantic Richfield Co. (2001) 25 Cal.4th 826, 850, 853.) Assuming [Crew] met that burden by asserting that the Privette doctrine immunized [it] against all stated causes of action, the burden then shifted to Johnson to present evidence demonstrating a triable issue of material fact: in other words, evidence that would allow a reasonable trier of fact to make a factual finding 5 in favor of Johnson by concluding one of the Privette doctrine’s exceptions applies.” (CBRE, supra, 102 Cal.App.5th at p. 646.) As we did in CBRE, “[w]e review the trial court’s order denying [Crew’s] motion for summary judgment under the same legal standard as the trial court and independently assess the correctness of the ruling.)” (CBRE, supra, 102 Cal.App.5th at p. 647.) Addressing the failure to disclose a concealed condition exception first, the majority in CBRE agreed with the trial court that Johnson presented “ ‘no evidence . . . suggesting PCF—an electrical subcontractor—could not have reasonably discovered the hazardous condition,’ ” regardless of whether the condition was the lack of permitting or the presence of the 277-volt wire. (CBRE, supra, 102 Cal.App.5th at pp. 650−651; see also Kinsman v. Unocal Corp. (2005) 37 Cal.4th 659, 664 [hirer can be liable for injury under concealed condition exception only if “the contractor did not know and could not have reasonably discovered this hazardous condition”].) The same is true here. In fact, the trial court’s statement, quoted by the majority in CBRE, was made in the context of Crew’s motion for summary judgment. Neither PCF nor Johnson was any less able to discover the lack of permits or the 277- volt wire based on Crew’s conduct as opposed to PRI and CBRE’s. Johnson presents no new evidence to the contrary. This leaves us with the question of whether Johnson raised a triable issue of fact regarding the retained control exception to the Privette doctrine announced in Hooker v. Department of Transportation (2002) 27 Cal.4th 198 (Hooker). (See id. at p. 210 [exception applies where “the hirer exercised the control that was retained in a manner that affirmatively contributed to the injury of the contractor’s employee”].)

6 The majority in CBRE concluded that PRI and CBRE’s instruction that the project proceed without permits was not sufficient to invoke the Hooker exception because “permits were not part of the contracted work.” (CBRE, supra, 102 Cal.App.5th at p. 653.) The majority reasoned, “[PRI and CBRE] did not retain control over whether, when, and how to pull permits as part of the project; everyone simply agreed from the beginning permits were not part of the project at all.” (Ibid.) Moreover, the majority concluded that none of PRI or CBRE’s actions precluded Johnson or PCF from taking independent steps that could have prevented Johnson’s electrocution. (Id. at p. 655.) As with the concealed condition exception, the same analysis applies to Crew. Regardless of who made the decision, PRI, CBRE, Crew, and PCF all knew the project was unpermitted. Just like Crew, PCF could have declined to work on the unpermitted project and/or could have taken additional steps to ensure the safety of its employees in the absence of permits. Johnson asserts the permits were legally required, not optional, and Crew’s failure to obtain them was presumptively negligent. The majority was not persuaded by similar arguments in CBRE. (CBRE, supra, 102 Cal.App.5th at p. 658.) Rather, they concluded “that those who enter into such agreements are held accountable in appropriate ways such that our decision will not encourage such agreements to proliferate.” (Ibid.) As the majority explained further, “Johnson’s return acknowledges, a person who violates the permit requirements in the San Diego Land Development Code is strictly liable for a misdemeanor under the San Diego Municipal Code, and can be subjected to fines, custody, injunctive relief, civil penalties, abatement, and other reasonable mitigation measures. (See San Diego Mun. Code, §§ 121.0311–121.0312.)” (CBRE, supra, 102 Cal.App.5th at p. 658.) And, as the majority noted, PRI and CBRE acknowledged the liability applies equally 7 to building owners, like them, and general contractors, like Crew. (Ibid.) We see no means by which to distinguish Crew’s willingness to proceed without permits from PRI and CBRE’s direction that Crew do so, at least not within the context of a Privette analysis. Beyond the permitting issue, Johnson asserts an additional basis for imposing the Hooker retained control exception on Crew. He argues Crew retained control by prematurely re-energizing the suite so it could move its temporary lighting to another project. As an initial matter, it is not apparent this was Crew’s decision, as Johnson asserts. Danny Machado from Crew testified that Crew removed the temporary lighting after “they” (presumably, PCF), turned the 277-volt circuit for the overhead lights back on. Johnson told Machado he finished all the lighting work the day before and was not working on any 277-volt circuits on the day of the incident. As Johnson concedes, PCF was responsible for the electrical safe-off. On the other hand, as Johnson points out, there is at least some question regarding Crew’s role in maintaining the power schedule for the project. Regardless, Johnson knew the 277-volt circuit was on when he went to the suite to work on the day of his injury. Specifically, he knew the 277-volt circuit was related to the lighting in the suite, which he had previously worked on, and he knew the lighting was on that day. And, as already discussed, PCF knew the project was not permitted and that updated circuit maps had not been drawn. Yet, neither Johnson nor PCF took additional precautions that both knew, or reasonably should have known, were necessary when working in an energized environment. Moreover, Johnson presents no evidence suggesting Crew required him to work in the re-energized setting or to deviate from his stated task of 8 finishing a 120-volt outlet to repair the junction box without first addressing the re-energized environment. (See Sandoval, supra, 12 Cal.5th at pp. 279−282 [hirer’s control over power-down process did not constitute retained control over contracted work where contractor had “ample freedom within the scope of its entrusted work to accommodate the presence of the live circuits effectively in its own manner”]; Cf. Tverberg v. Fillner Construction, Inc. (2012) 202 Cal.App.4th 1439, 1443 [general contractor ignored request to address unsafe situation].) To the extent Johnson asserts he did not know there would be a 277-volt circuit in the junction box when he went to replace the cover, this brings us back to the permitting issue that the majority addressed in CBRE. Accordingly, the additional factor of Crew’s involvement in re-energizing the suite does not compel a different result in this case. III. DISPOSITION The judgment is affirmed. Crew Builders is awarded costs on appeal.

KELETY, J.

WE CONCUR:

O’ROURKE, Acting P. J.

CASTILLO, J.

9 Kelety, J., concurring. I write separately to clarify that I continue to believe a jury should decide whether Property Reserve, Inc. (PRI) and CBRE—and, in this case, Crew—retained control over the construction project when they agreed not to obtain legally necessary permits, as stated in my dissent in the CBRE v. Superior Court (2024) 102 Cal.App.5th 639 (CBRE). I join the majority in this case because I agree that there are no material differences in Crew’s role that would compel a different result than the majority decision in CBRE. Although Crew could have declined to participate in the project without permits, it followed PRI and CBRE’s instructions as to the absence of permits, and, in my view, Crew should not be held accountable if PRI and CBRE are not.

KELETY, J.